Express Capital Funding

Guides

The Contractor's Working Capital Field Guide

Where each construction trade's cash gap sits in the build sequence, the three gap types (mobilization, draws, closeout) and how to size funding to the gap.

Express Capital Funding||8 min read

The short answer

Construction contractors can fund their cash gaps by matching short-term working capital to the specific gap their trade creates: mobilization costs at the start of a job, the draw-and-retainage gap mid-project, or the closeout wait for final payment and retainage. Where a trade sits in the build sequence decides which gap bites hardest. Size funding to the deepest point of that gap, not the contract value.

Smiling contractor in a yellow hard hat and high-visibility vest holding a tablet in a dim interior work area

Key takeaways

  • Every trade has a cash gap, and its position in the build sequence decides whether that gap lands at mobilization, mid-project, or at closeout.
  • Early trades spend first and often wait longest for retainage; late trades sit at the slow end of the project's payment chain.
  • Size funding to the deepest point of the gap (cumulative cash out minus cash in) plus a cushion for late pay, never to the contract value.
  • A gap that closes when the job pays is a timing problem funding can solve. A gap that never closes is a pricing or terms problem, and capital makes it worse.
  • Equipment that works for years belongs in equipment finance. Revenue-based working capital is built for timing.

The contractors we talk to describe the same problem in a dozen different words. The excavator says fuel and rentals. The mason says brick deposits. The painter says the general contractor is sixty days behind. The general contractor says the draw inspector has not been out yet. It is one problem, money leaving before money arrives, but it shows up at a different point in the job for every trade, and the right fix depends on where.

This guide is the map. It lays out the trades in the order they typically appear on a building, names the three kinds of cash gap a construction business can have, shows how to size funding to the one you actually have, and is plain about when revenue-based capital is the wrong tool.

Your place in the build sequence decides where your cash gap sits

Most of the hands on a building belong to specialty trades working as subcontractors. According to the Bureau of Labor Statistics, specialty trade contractors (the firms that pour concrete, prepare sites, wire, plumb and paint) employ more than five million people, more than half of everyone working in construction, and their production work is usually subcontracted from general contractors or operative builders. That last point matters more than it looks. Most trades are paid on someone else's payment cycle, and where they sit in the sequence decides how long that cycle makes them wait.

TradeWhen it is usually on siteWhere the cash gap usually sits
Excavation and site workFirst: clearing, grading and utilities, often back at the end for final gradeMobilization: transport, rentals, fuel and hauling before the first estimate; retainage on early-finished scope can wait for project closeout
ConcreteEarly for foundations and structure, again later for flatworkPour days: ready-mix, pumping, forming and a large crew paid ahead of the pay application
MasonryMid-sequence, after footings, framing and windowsBrick and stone deposits plus weekly crew payroll; cold weather adds protection costs
ElectricalRough-in mid-job, trim and gear near the endLong-lead gear and wire bought early; billing in two phases stretches the wait
Drywall and insulationMid-to-late, after rough-in inspectionsLabor-heavy weekly payroll against monthly pay applications; materials stocked floor by floor
PaintingLate, after drywall finishingLabor-heavy and last in line; punch list and retainage stretch the final payment
FlooringLate, among the last finishesSpecial-order materials paid for before install; closeout retainage
Residential general contractors and home buildersStart to finishPaying subs and suppliers between construction-lender draws or owner payments
Commercial general contractorsStart to finishPaying subs on time while the owner's pay cycle and retainage run behind; closeout on the whole job
Remodeling and restorationCompressed: every phase within weeksMaterials and deposits ahead of homeowner or insurance payments; change orders mid-job
Typical patterns on a building project, not rules. Contracts, payers and markets set the real timing, and residential and commercial jobs order trades differently.

Each trade has its own page on where its gap sits and how to fund it: excavation and site work, concrete, masonry, electrical, drywall and insulation, painting, flooring, residential general contractors and home builders, commercial general contractors, and remodeling and restoration.

There are only three kinds of construction cash gap

Strip away the trade vocabulary and every construction cash problem is one of three shapes. Knowing which one you have tells you how big the funding should be, what repays it, and whether funding is the answer at all.

1. The mobilization gap

The front-end hole on a new job: insurance certificates, bond premiums, materials deposits, equipment transport and the first payroll cycles, all spent before the first pay application can even be submitted. It is one-time per job, and it closes when that job's first payments catch up with its costs. Early trades and general contractors feel it hardest. It is also the cleanest gap to fund, because the money that repays it already has a signature on it. Our guide to funding a contract you just won walks through it step by step.

2. The draw-and-retainage gap

The mid-project squeeze. You bill monthly on percent complete, the payment commonly arrives 30 to 60 days or more after the work, and a slice of every payment is often held as retainage. Payroll runs weekly the whole time. The deepest point usually lands in the middle of the job, and it tends to hit labor-heavy middle trades (masonry, drywall, electrical rough-in) hardest. It is structural rather than a sign of trouble, and it repeats every pay cycle until the job winds down. Our progress billing guide works through the math of a mid-project month.

3. The closeout gap

The long tail. After substantial completion come the punch list, inspections, closeout documents and finally the release of retainage. For late trades, that wait follows directly from their own work. For early trades it is worse: a site contractor who finished in month two can wait until the whole building is accepted to see the retainage on that scope. The closeout gap is smaller in dollars than the other two but longer in time, and across several jobs at once it adds up.

SigningCloseoutMobilizationDraw 1Draw 2Final + retainageYour crew and materials run ahead of the draws
All three gaps on one ladder: mobilization at the bottom, progress draws in the middle, final payment and retainage at the top, each landing later than the crew and materials costs that earned it.

Size funding to the gap, not the contract

The instinct after a large award is to think in contract dollars. The number that needs financing is smaller and more specific: the deepest point of the gap between cumulative cash out and cumulative cash in. Here is how to find it.

  1. 1

    List every dollar out, week by week

    Deposits, materials, payroll, rentals, insurance and subcontractor payments, from signing to the last payment on the job.

  2. 2

    List every dollar in, on realistic dates

    Pay applications on the payer's actual history, less retainage, rather than the contract's ideal terms. First payments on new contracts have a habit of running late.

  3. 3

    Find the deepest week

    Run the total of out minus in. The lowest point is the gap. Subtract the cash the business can genuinely commit without starving other jobs.

  4. 4

    Add a cushion for a slow payer

    A week or two of costs is a reasonable margin for a late approval or a returned pay application.

  5. 5

    Test the payment against your thinnest weeks

    A facility's payment has to sit comfortably inside your slowest stretch, not your average month. If it only works in a good month, it is too big.

Say a hypothetical $300,000 subcontract shows its deepest week at $85,000 short, in week seven, and the business has $25,000 it can commit. The gap to fund is roughly $60,000 plus a cushion. It is not $300,000.

A contractor's file reads well when the pattern is explained

Underwriting reads the business, not the contract: the level of your deposits and how consistent they are over time, how long the business has operated, and how much of its cash flow is already committed to other financing. Construction deposits are lumpy by nature, because draws land in clusters. That lumpiness is read as the shape of the work when it is explained, and as volatility when it is not.

So explain it. One page alongside your statements, listing active jobs, who pays on which cycle, which months carried a large draw, and how much retainage is currently held, turns an erratic-looking file into a schedule. A direct lender reads that file in-house, which is why the move from signed documents to funds is measured in days, not weeks.

When revenue-based capital is the wrong tool

And before funding any gap, ask the customer. A mobilization line item in the schedule of values, a materials deposit, or reduced retainage once the job passes the halfway mark are all common requests, and the cheapest bridge is the one your customer funds.

Express Capital is a direct lender: our own capital, decisions made in-house, one dedicated advisor per file. Most of our clients come back, which says less about us than about the model: funding sized to a real job and repaid on the job's own schedule tends to leave an owner ready to bid the next one.

Sources

  1. [1] Specialty Trade Contractors: NAICS 238 — U.S. Bureau of Labor Statistics (2026). Defines the subsector, notes that its production work is usually subcontracted from general contractors or operative builders, and reports employment of about 5.28 million (September 2026, preliminary).
  2. [2] Construction: NAICS 23 — U.S. Bureau of Labor Statistics (2026). Reports total construction employment of about 8.36 million (September 2026, preliminary).

Express Capital Funding · Direct lender

See what your revenue supports

We underwrite in-house and fund from our own balance sheet. $250,000+ in yearly revenue, 1+ year in business, and a 580+ credit score is the gate — a decision the same day, funding in as little as 24–48 hours.

Start your application

4.8★ from 590 reviews · A+ BBB accredited · $250M+ funded

Frequently asked questions

How do contractors get working capital between progress payments?

The cleanest bridge is short-term working capital sized to the deepest point between costs and pay applications, repaid as those payments land. Underwriting reads deposit level and consistency, time in business and existing obligations, so explaining your draw schedule alongside your bank statements matters as much as the numbers.

Which construction trades have the worst cash-flow gaps?

It depends on where the trade sits in the build. Early trades like site work and concrete carry the heaviest mobilization costs and can wait longest for retainage. Labor-heavy middle trades like masonry and drywall feel the draw gap most. Late trades like painting and flooring wait on punch lists and closeout.

How much working capital should a subcontractor have for a new job?

Enough to cover the deepest point of the job's gap: cumulative costs minus cumulative payments, at its lowest week, less the cash you can commit, plus a cushion for a late payer. That is usually far smaller than the contract value, and asking for it rather than the largest available number keeps the payment comfortable.

Should a contractor use working capital to wait out retainage?

It can make sense when the retainage is earned, the release has a realistic date, and the money is needed to perform other signed work. It makes less sense as a standing arrangement. If retainage across many jobs is permanently starving the business, push for reduced retainage or early release in your contracts.

When should a contractor not use revenue-based funding?

When the gap never closes from job to job, when the job is underbid, when the need is a long-life machine that fits equipment finance, when the receivable is disputed, or when the money would cover payments on existing advances. In each case, capital adds cost without fixing the cause.

Keep reading

Published by Express Capital Funding, a direct lender to U.S. small and mid-sized businesses. This article is general information, not financial, legal, or tax advice, and is not an offer or commitment to lend.

← More guides