Working Capital for Commercial General Contractors

How monthly pay applications, owner and architect review, 30–60+ day payment and retainage shape a commercial GC's float — and how to size capital to it.

Express Capital Funding||7 min read

The short answer

Commercial general contractors often fund the float between weekly costs — subcontractor payments, self-performed payroll, general conditions — and monthly pay applications with short-term working capital sized to the deepest point of that float and repaid as approved applications pay. Owners commonly pay 30 to 60 or more days after submission, once architect review clears, and hold retainage until substantial completion.

Superintendent in a hi-vis vest reviewing printed plans on a pickup tailgate at a steel-frame commercial site with a tower crane

Key takeaways

  • A commercial GC sits in the middle of the payment chain: costs go out weekly, and money comes in once a month — after review, certification, and the owner's payment terms.
  • The schedule of values is a cash plan: how general conditions, mobilization and stored materials bill decides how deep the float runs.
  • You hold retainage from subs as the owner holds it from you, but on self-performed work and general conditions there is nobody to pass the hold down to.
  • A GC's deposits are largely other people's money passing through to subs; showing what stays with you makes the file read accurately.
  • Capital bridges an approved pay application. It does not fix a job bought below cost or a change order still under negotiation.

A commercial general contractor is the one party on the job that pays almost everybody before anybody pays it. Subcontractors bill monthly and expect to be paid when you are — or sooner, if they hold the critical path. Your superintendent, project manager, and self-perform crews are on weekly payroll. The trailer, temporary power, insurance, and the bond were paid at mobilization. And the owner pays once a month, after a review cycle you do not control.

That float — what you have paid out against what has come in — is the defining cash problem of the commercial GC, and it grows with every job you win. The clause that pushes the wait down to subs and the money held back from every draw each have their own pages: how pay-when-paid clauses move the gap and the math of retainage. This page is about the GC's side of the ledger: how the monthly cycle runs, where it stretches, and how to size capital to it.

The pay application is a monthly cycle with a weekly cost base

Commercial work bills against a schedule of values: the contract broken into line items — general conditions, sitework, concrete, steel, each trade's scope — each with a scheduled dollar value. Every month you submit an application for payment, typically a summary sheet plus a continuation sheet in the familiar AIA G702/G703 style, showing work completed this period, materials stored, retainage withheld, and what has already been paid. Behind it sit your subs' own applications and the lien waivers the owner will want before releasing money.

Then it waits. Many projects run a pencil draft past the architect or owner's representative first; the formal application is then certified; and on a financed project the owner's lender sends its own inspector before it funds. Payment terms commonly run 30 days from approval, and 45 to 60 days or more from submission is common in practice. Every week of that, next month's work is already being built — on your account.

Step in the cycleTypical timingWhat the GC is carrying meanwhile
Work in place for the billing periodThrough the monthSelf-perform payroll weekly, sub progress, materials, general conditions
Sub applications and lien waivers collected; pencil draft reviewedOften the last week of the monthThe next period's work, already underway
Application certified by the architect or owner's representativeCommonly one to two weeks after submissionAnother round of payroll and supplier bills
Owner's lender inspects and funds, on financed projectsAdds days to weeksSubs asking when they will be paid
Payment received, less retainageOften 30 days after approval; 45–60+ days after submission is commonThe float peaks just before this check lands
Retainage releasedCommonly at substantial completion, with final release after closeout documentsOften 5–10% of the contract, held for months after the last trade leaves
Typical industry mechanics, not a rule for any one contract — your agreement, the owner's lender, and state law set the actual clock.
Day 90The gap you carryDay 0Work deliveredDay 60–75Invoice paidPayroll, weeklyMaterials buys
The GC's version of the gap: work delivered across the month, payment landing weeks after the application, and payroll, subs, and general conditions arriving on their own schedule in between. The days are hypothetical; the shape is not.

The GC floats the subs, the payroll, and the general conditions

Pay-when-paid language exists to push the wait down the chain, but in practice a GC rarely gets to hide behind it. The mechanical sub on the critical path cannot be left unpaid for 75 days without the schedule paying for it, and the trades you want on your next bid remember who paid on time. Self-performed work — concrete, carpentry, the superintendent's whole crew — never had a pay-when-paid clause at all. General conditions run every month regardless of how much work the application captures.

Run the shape on hypothetical numbers. Say a GC is billing about $400,000 a month on a tenant build-out, with subs accounting for $300,000 of each month's work and self-performed labor plus general conditions another $70,000. If the GC pays its own crews weekly and its key subs about 30 days after their applications, while the owner pays the GC about 55 days after submission, then at the deepest point of each cycle the GC has paid out most of a month's job cost that the owner's check has not yet covered — on a job that is on budget and on schedule. Win a second job like it and the float roughly doubles.

Build the schedule of values like a cash plan

The float is not fixed. How you write the schedule of values and run the billing changes how deep it goes, and every lever here is cheaper than borrowed money.

Public work runs on rules of its own. On federal construction contracts, the standard prompt-payment clause makes progress payments due 14 days after the designated billing office receives a proper payment request, and requires each subcontract to oblige the prime to pay for satisfactory work within 7 days of receiving payment for it. Private commercial work has no single clock: the contract, and in many states a prompt-payment statute, sets it — and the owner's review cycle decides how close reality comes to the paper.

Working capital bridges approved applications, not losses or disputes

A bridge assumes an approved application on the far bank. Be honest about which gap you are actually in.

And if a surety backs your work, talk to them before you add any short-term obligation, because it shows up on the balance sheet they read. Capital that carries a profitable float is a different story from capital that papers over losses — our piece on how working capital shapes bonding capacity walks through how sureties look at it.

A GC's statement is mostly other people's money — show what stays

Underwriting starts with deposits: their level, how consistent they are over time, how long the business has been running, and how much of that cash flow is already committed to other financing. A GC's statements have a quirk. A large share of every deposit belongs to someone else, passing through to subs within weeks. An underwriter who reads construction files knows that, and you make it easier by showing it. Two lines — which deposits were pay applications on which jobs, and the sub payouts that followed — turn a statement full of large in-and-out swings into what it is: a billing cycle. The full sequence is laid out in how a funding decision actually gets made.

  1. 1

    Map the float by job

    For each active job: the last application submitted, its approval status, the expected payment date, and the subs you will pay before it lands. The deepest week across all jobs is your number.

  2. 2

    State retainage receivable and payable

    What owners hold from you, what you hold from subs, and the realistic release windows. The difference is earned money your statements cannot show.

  3. 3

    Size to the gap and plan the payoff

    Fund the deepest point of the float, not the contract value, and plan to clear it as the approved applications pay. Right-sized beats bigger. If you are paid in lumps, read how any funding agreement handles early payoff before you sign it.

From there it is one dedicated advisor, start to finish, who knows what a continuation sheet and a conditional lien waiver look like, and a decision made in-house. Once documents are signed, the move to funds is measured in days, not weeks.

Sources

  1. [1] FAR 52.232-27, Prompt Payment for Construction Contracts — Federal Acquisition Regulation, Acquisition.gov (2017). Progress payments are due 14 days after the designated billing office receives a proper payment request; the subcontract clause requires the prime contractor to pay subcontractors within 7 days of receiving payment.

Express Capital Funding · Direct lender

See what your revenue supports

We underwrite in-house and fund from our own balance sheet. $250,000+ in yearly revenue, 1+ year in business, and a 580+ credit score is the gate — a decision the same day, funding in as little as 24–48 hours.

Start your application

4.8★ from 590 reviews · A+ BBB accredited · $250M+ funded

The Commercial GCs library

Frequently asked questions

How do general contractors pay subcontractors before the owner pays them?

Most commercial GCs carry the gap out of their own working capital — cash reserves, a bank line, or short-term working capital sized to the float — because key subs on the critical path cannot wait the full owner cycle. Pay-when-paid clauses shift part of the wait down the chain, but self-performed payroll and general conditions never had that option.

Can a commercial GC get working capital while a pay application is in review?

That is one of the most common gaps short-term working capital is used for. It is sized to the deepest week of the float across your jobs, not to the contract value, and repaid as the applications pay. Bring the schedule of values and each application's status — they explain the lumps in your deposits.

How long do owners take to pay commercial construction pay applications?

Commonly 30 days after the application is approved, which in practice often means 45 to 60 days or more after submission once review, certification, and any lender inspection are counted. Federal jobs run on a regulated prompt-payment clock; private work runs on the contract and, in many states, a prompt-payment statute.

Does retainage count when a general contractor applies for funding?

It is not in your deposits until it releases, but stating it gives a fuller picture of what the business has earned. List the retainage owners hold from you and the retainage you hold from subs, with realistic release windows; the difference is the part that is genuinely yours and genuinely waiting.

Should a GC use working capital to cover a loss on a job?

No. Capital bridges timing, not margin. If a job was bid below cost or is running past what the contract will pay, borrowing extends the loss and can strain your bonding. The fix lives in change orders, the owner conversation, and the next bid.